Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 66669 DEA: JMF-DATA EFIS: JMF-DATA
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for storing JMF sample data
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2023-07-21-68
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Verification
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 07/21/2023
Date that the sample was received by the laboratory/organization performing the testing: 07/21/2023
The quantity of what the sample constitutes: 6 bags
A brief description of the sample: 1/2" agg
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Construction - Bradshaw
DIME Test ID: 2023-07-21-68-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 08/17/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Submitted from JMF - Esther Foo
Test Result Compliance:
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
No
|
|
Cumulative percent passing the 2 in. sieve
|
no data
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
no data
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
100 %
|
|
Cumulative percent passing the #4 sieve
|
80 %
|
|
Cumulative percent passing the #8 sieve
|
59 %
|
|
Cumulative percent passing the #16 sieve
|
44 %
|
|
Cumulative percent passing the #30 sieve
|
34 %
|
|
Cumulative percent passing the #50 sieve
|
24 %
|
|
Cumulative percent passing the #100 sieve
|
16 %
|
|
Cumulative percent passing the #200 sieve
|
11.4 %
|
DIME Test ID: 2023-07-21-68-2
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 08/17/2023
Date Tested: 08/04/2023
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Submitted from JMF - Esther Foo
Test Result Compliance:
Additional Comments When Verified:
|
Number of tests
|
3
|
|
What is the unit of measurement for theoretical density?
|
US Units
|
|
Mass Determination
|
Water
|
|
Specific Gravity for Sample 1
|
no data
|
|
Specific Gravity for Sample 2
|
no data
|
|
Specific Gravity for Sample 3
|
no data
|
|
Average Specific Gravity
|
2.758
|
|
Theoretical maximum density at 25°C (77°F)
|
no data
|