Print Report | Back to Sample Detail

Sample Record for 2023-08-05-62

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 QA Service Level: 1
DIST-CO-RTE-PM: 04-CC-80-10.1/13.5
Work Description: Remove PCC and AC, place PCP and AC Resurfacing.
Location Description: Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct.
Contractor Name: VANGUARD CONSTRUCTION, INC.
Contractor Address: 651 ENTERPRISE CT, LIVERMORE, CA 94550
Resident Engineer: Ta Seng Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-08-05-62
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Richmond Field Laboratory
Sample Organization Contact: (510) 231-7151
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 08/05/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/05/2023
The quantity of what the sample constitutes: 2500g
A brief description of the sample: Existing Subgrade
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Native Material

Material Information

The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: HWY 80 Lane 2 East Bound
Where the material sample would have been placed if not sampled:

Test Results

Test 1 of 1

DIME Test ID: 2023-08-05-62-2
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Verified Date: 09/12/2023
Date Tested: 08/05/2023
Submitted By Organization: CT D04 - Richmond Field Laboratory
Organization Address: 3401 Regatta Boulevard,
Organization City: Richmond
Organization State: CA
Organization Zipcode: 94508
Organization Email: santiago.sequeira@dot.ca.gov
Organization Phone: (510) 385-7641
General Comments for this Test: 98%Relative Compaction Passed
Test Result Compliance: complies
Additional Comments When Verified:
Sum of Count or Density 76726.00 g/cc
Average of Count or Density 25575.00 g/cc
Sum of Moisture Count 9231.00 g/cc
Average of Moisture Count 3077.00 g/cc
Count Ratio Density 29599.00
Count Ratio Moisture 8428.00
Calculated Percent Relative Compaction 97.6 %
Reported Percent Relative Compaction 98 %

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-08-05-62-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages09/12/2023Not scheduledIGNACIO ARECHIGACT D04 - Richmond Field Laboratory98%Relative Compaction Passed