Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215620 DEA: 01436404 EFIS: 0100000193
QA Service Level: 1
DIST-CO-RTE-PM: 01-DN-101-35.8/36.5
Work Description: Dr. Fine Bridge Replacement
Location Description: DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
Contractor Name: MCM Construction
Contractor Address: PO Box 620, North Highlands, Ca 95660
Resident Engineer: Clayton Malmberg Structure Rep.: Brian Cinkutis
DIME Sample ID: 2023-09-06-1
TL Number from the TL Form:
Sample Submitted By Organization: CT D01 - Crescent City Field Laboratory
Sample Organization Contact: (707) 496-5581
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 09/06/2023
Date that the sample was received by the laboratory/organization performing the testing: 09/07/2023
The quantity of what the sample constitutes: 66 cy
A brief description of the sample: Detour bridge Column 4 Right
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Tidewater Starry pit
The concrete mix design number: SR-Minor StructureNA
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: TBD
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Back of Truck
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
DIME Test ID: 2023-09-06-1-1
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 09/13/2023
Date Tested: 09/13/2023
Submitted By Organization: CT D01 - Crescent City Field Laboratory
Organization Address: 207 Price Mall,
Organization City: Crescent City
Organization State: CA
Organization Zipcode: 95531
Organization Email: clayton.malmberg@dot.ca.gov
Organization Phone: (707) 496-5581
General Comments for this Test: 7 day break
Test Result Compliance: not applicable
Additional Comments When Verified:
Unit system used?
|
US Units
|
Number of specimens
|
1
|
Test performed
|
With density determined by dimension measurements
|
Density of cylinder
|
152 lb/ft^3
|
Average diameter of cylinder 1
|
6.00 in
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
DIME Test ID: 2023-09-06-1-2
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 10/04/2023
Date Tested: 10/04/2023
Submitted By Organization: CT D01 - Crescent City Field Laboratory
Organization Address: 207 Price Mall,
Organization City: Crescent City
Organization State: CA
Organization Zipcode: 95531
Organization Email: clayton.malmberg@dot.ca.gov
Organization Phone: (707) 496-5581
General Comments for this Test: 28 day break
Test Result Compliance: complies
Additional Comments When Verified:
Unit system used?
|
US Units
|
Number of specimens
|
2
|
Test performed
|
With no density determined
|
Capped in accordance with?
|
ASTM C617 - Sulfur Mortar Cap
|
Average diameter of cylinder 1
|
6.00 in
|
Average diameter of cylinder 2
|
6.00 in
|
Cross sectional area of cylinder 1
|
28.27 in^2
|
Cross sectional area of cylinder 2
|
28.27 in^2
|
Compressive strength (to nearest 10 psi)
|
6200 psi
|
Maximum load on cylinder 1
|
171700 lb
|
Maximum load on cylinder 2
|
178650 lb
|
Compressive strength of cylinder 1
|
6073.6 psi
|
Type of fracture pattern of cylinder 1
|
5
|
Compressive strength of cylinder 2
|
6319.4 psi
|
Type of fracture pattern of cylinder 2
|
5
|
Comment on any defect in either specimen or caps (Max 250 Characters)
|
no data
|
Correction factor for cylinder 1
|
1
|
Correction factor for cylinder 2
|
1
|
Age of specimen
|
28 days
|
Age of specimen in hours
|
0 hours
|