Print Report | Back to Sample Detail

Sample Record for 2023-08-12-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB,BUT-70-25.5/25.8,0.0/3.8
Work Description: WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE.
Location Description: YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD
Contractor Name: Teichert Construction & MCM JV
Contractor Address: 4401 Duluth Ave, Rocklin, CA 95766
Resident Engineer: Anthony Granados Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2023-08-12-5
TL Number from the TL Form:
Sample Submitted By Organization: CT D03 - Chico Field Laboratory
Sample Organization Contact: (916) 799-4305
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/12/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/14/2023
The quantity of what the sample constitutes: 12 boxes
A brief description of the sample: 3/4" HMA-A W/ 15% RAP
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name: HWY-70
The fabricator/manufacturer/facility name: Teichert Materials Hallwood

Material Information

HMA Type: Type A HMA
HMA Grading: 3/4 inch
Lot number: 6
Sublot number: 17
HMA Mix Number: 30940432407V
Binder content (%):
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results