Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 994999 DEA: 061A1204 EFIS: 0621000176
QA Service Level: 1
DIST-CO-RTE-PM: 06-FRE-5,41,180-Var
Work Description:
Location Description:
Contractor Name: MYERS & SONS CONSTRUCTION, LLC
Contractor Address: Unknown
Resident Engineer: Cary Cruz Structure Rep.: Jason Frank
DIME Sample ID: 2023-08-10-29
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Department Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 08/10/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/10/2023
The quantity of what the sample constitutes: BRIDGE DECK
A brief description of the sample: POLY
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: JOB SITE
DIME Test ID: 2023-08-10-29-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 08/11/2023
Date Tested: 08/10/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: HWY 41 Ost UC/SB-TEST DONE ON MEADIAN SHOULDER, WILL REPRESENT BRIDGE PER INSPECTOR
Test Result Compliance: complies
Additional Comments When Verified:
|
Pavement or Bridge Deck?
|
Bridge Deck
|
|
Average Coefficient of Friction
|
0.47
|