Print Report | Back to Sample Detail

Sample Record for 2023-08-03-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214627 DEA: 05344904 EFIS: 0500000505 QA Service Level: 1
DIST-CO-RTE-PM: 05-SBT-156-3/R8.2
Work Description: SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE.
Location Description: SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156
Contractor Name: A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION
Contractor Address: 223 Harrison Road 1B, Salinas, CA 93907
Resident Engineer: Frank (Farrukh) Sana Structure Rep.: Neil Weller

Sample Information

DIME Sample ID: 2023-08-03-1
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Monterey Construction Field Laboratory
Sample Organization Contact: 831-818-0254
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 08/03/2023
Date that the sample was received by the laboratory/organization performing the testing: 08/04/2023
The quantity of what the sample constitutes: 2x 6x12 cylinders
A brief description of the sample: Concrete Test Samples
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: Retaining Wall
The fabricator/manufacturer/facility name: Don Chapin Hollister

Material Information

The concrete mix design number: CAS590P
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: NA
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: NA
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-08-03-1-1CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders08/03/202308/31/2023Carson SperberCT D05 - Monterey Construction Field LaboratoryWesley Rider