Sample Record for 2023-05-22-106
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166
QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-7.3/9.6
Work Description: !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location Description: SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: PO Box 6744, Santa Barbara , CA 93111
Resident Engineer: Luobao Cai Structure Rep.: Emiliano Berntsen
Sample Information
DIME Sample ID: 2023-05-22-106
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Sample Organization Contact: (805) 621-3616
Type of Sample: Department Acceptance
Type of Material: Concrete
Sample Taken Date: 05/22/2023
Date that the sample was received by the laboratory/organization performing the testing: 05/22/2023
The quantity of what the sample constitutes: 600 CY
A brief description of the sample: Concrete Sample
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granites Portable Plant
Material Information
The concrete mix design number: 231R
The truck number from where the sample was collected: 1980
The batch plant ticket number from where the sample was collected: 12557
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Discharge from concrete truck into wheelbarrow.
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 3
DIME Test ID: 2023-05-22-106-1
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 06/30/2023
Date Tested: 05/22/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Test 2 of 3
DIME Test ID: 2023-05-22-106-2
Test Method: CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement Concrete
Verified Date: 06/30/2023
Date Tested: 05/22/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Ball penetration in freshly mixed concrete (average)
|
2 inch
|
Test 3 of 3
DIME Test ID: 2023-05-22-106-3
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Verified Date: 06/30/2023
Date Tested: 05/22/2023
Submitted By Organization: CT D05 - Carpinteria Field Laboratory
Organization Address: 21 Griffin Road North,
Organization City: Windsor
Organization State: CT
Organization Zipcode: 06095-1590
Organization Email: dlachaine@trccompanies.com
Organization Phone: (805) 621-3616
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified: