|
Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 043Y6404 Cty MRN Rte 101 PM 24.01/24.01 Vendor # |
|
REPORT OF LABORATORY TESTING |
||||
|
Resident Engineer: |
Fabio La serna |
Date Reported: |
11/13/2023 |
|
|
Address: |
TL Number: |
|
||
|
City: |
||||
|
Project Name: |
||||
|
Prime Contractor: Ghilotti Construction Company |
||||
|
Sample Taken Date: |
06/22/2023 |
Mix Design: |
SL-4700CG |
|
|
Contractor: Unknown |
Location : |
|||
|
Structure unique identifier: |
||||
|
Structure name: San Antonio Blvd - Emergency Soldier Pile Wall |
||||
|
Location of Pour: Piles 7 and 9 |
||||
The following testing has been tested in accordance with:
ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
| Temperature |
|---|
| 75 |
DIME Test ID: 2023-06-22-9-2
Certified By: Philip Latasa
ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
| Slump |
|---|
| 7.5 |
DIME Test ID: 2023-06-22-9-3
Certified By: Philip Latasa
Test ID: 2023-06-22-9-1: Please break and provide results to Mr. Light.
|
*Subject to final inspection by the Resident Engineer. |
|
TL- Report of Laboratory Testing