Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 212498 DEA: 021H5204 EFIS: 0217000009
QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-3,263-48.5/49.7 - 49.41
Work Description: Roadway Rehabilitation
Location Description: 02-Sis-3, 263-R46.8/R48.0, 49.07/49.41
Contractor Name: Myers-Shea JV
Contractor Address: 45 Morrison Ave, Sacramento, CA 95838
Resident Engineer: Austin Henry Structure Rep.: Nicolas Jimenez
DIME Sample ID: 2023-05-15-58
TL Number from the TL Form: 815608
Sample Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Sample Organization Contact: (530) 225-3194
Type of Sample: Control Sample
Type of Material: Hot Mix Asphalt
Sample Taken Date: 05/15/2023
Date that the sample was received by the laboratory/organization performing the testing: 05/15/2023
The quantity of what the sample constitutes: Correction Factor Determination
A brief description of the sample: Laboratory Mixed Treated 3/4-inch Type A HMA (eq. PG 64-28 M)
From where was the sample collected: Manufacturer
Laboratory sample identification: D79228CF1
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: JF Shea Construction - Fawndale Rock and Asphalt - Redding, CA
DIME Test ID: 2023-05-15-58-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 05/30/2023
Date Tested: 05/25/2023
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of the specimen basket assembly
|
3114.8 g
|
|
Mass of the specimen and specimen basket assembly prior to ignition
|
5204.5 g
|
|
Mass of HMA Sample prior to ignition
|
2089.7 g
|
|
Corrected Asphalt Binder Content
|
4.89 %
|
|
Mass Loss
|
105.2 g
|
|
Mass of aggregate remaining after ignition
|
1984.5 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
no data0 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
0.14 %
|
|
Test Temperature
|
538 C
|
DIME Test ID: 2023-05-15-58-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 05/30/2023
Date Tested: 05/25/2023
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
No
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
88 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
77 %
|
|
Cumulative percent passing the #4 sieve
|
49 %
|
|
Cumulative percent passing the #8 sieve
|
30 %
|
|
Cumulative percent passing the #16 sieve
|
21 %
|
|
Cumulative percent passing the #30 sieve
|
15 %
|
|
Cumulative percent passing the #50 sieve
|
12 %
|
|
Cumulative percent passing the #100 sieve
|
9 %
|
|
Cumulative percent passing the #200 sieve
|
7.7 %
|