Print Report | Back to Sample Detail

Sample Record for 2023-04-24-90

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-55,55-29.6,R6.4/10.3
Work Description: CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS.
Location Description: ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 Townsgate Road, Suite 200, Westlake Village, CA 91361
Resident Engineer: Adrian Wu Structure Rep.: Yong Gyun Park

Sample Information

DIME Sample ID: 2023-04-24-90
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 04/24/2023
Date that the sample was received by the laboratory/organization performing the testing: 05/10/2023
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0247-23
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan-Santa Ana

Material Information

Performance Grade: PG 64-10
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 7

DIME Test ID: 2023-04-24-90-1
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Specific Gravity 1.019

Test 2 of 7

DIME Test ID: 2023-04-24-90-2
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.9 %
Insoluble, percent 0.1 %

Test 3 of 7

DIME Test ID: 2023-04-24-90-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 89.5 degree
Dynamic Shear, G*/sin(δ) 1.61 kPa
(G*) x sin(δ)= no data

Test 4 of 7

DIME Test ID: 2023-04-24-90-4
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Test Plate Diameter 25 mm
Phase Angle (δ) (for the 10 cycles) 88.8 degree
Dynamic Shear, G*/sin(δ) 2.80 kPa

Test 5 of 7

DIME Test ID: 2023-04-24-90-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? cP
Time of test 10:25 HH:MM
Test Temperature 135 C
Speed 100 rpm
Spindle size 21 in
Torque 54 %
Viscosity reading #1 (A) 0.269 cP
Viscosity reading #2 (B) 0.272 cP
Viscosity reading #3 (C) 0.27 cP
Average viscosity 0.27 Pa-s

Test 6 of 7

DIME Test ID: 2023-04-24-90-6
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 05/12/2023
Date Tested: 05/11/2023
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test: Corrected: -.223+.006= -.217
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Any material loss from containers during heating process/testing? Yes
Mass of empty container #1 167.268 grams
Mass of empty container #2 169.567 grams
Mass of container #1 before test (m1i) 201.988 grams
Mass of container #2 before test (m2i) 204.425 grams
Mass of container #1 after test (m1f) 201.911 grams
Mass of container #2 after test (m2f) 204.347 grams
Average mass change -0.223 percent

Test 7 of 7

DIME Test ID: 2023-04-24-90-7
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
Data has not been verified.