Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 041A2904 Cty SON Rte 12 PM 9.6 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Syd Valeh |
Date Reported: |
10/28/2015 |
|
Address: |
TL Number: |
018316 |
||
City: |
||||
Project Name: REPLACE BRIDGE AND WIDEN APPROACHES. |
||||
Prime Contractor: GHILOTTI CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
09/30/2015 |
Mix Design: |
unknown |
|
Contractor: Unknown |
Location : SONOMA COUNTY NEAR THE CITY OF SEBASTOPOL AT LAGUNA DE SANTA ROSA BRIDGE |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: bridge deck Pak |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.01 | 28.37 | 117010 | 4124.4 | 1 |
2 | 6.01 | 28.37 | 108479 | 3823.7 | 1 |
DIME Test ID: 2015-09-30-9-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 3970
Age of specimen: 28 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing