Print Report | Back to Sample Detail

Sample Record for 2023-04-25-47

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 994401 DEA: 09379304 EFIS: 0919000007 QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-127-21.0/34.5,41.8/49.4
Work Description: PARTIAL DEPTH RECYCLE AND HOT MIX ASPHALT (TYPE A).
Location Description: INYO COUNTY NEAR SHOSHONE FROM 4.6 MILES NORTH OF ROUTE 178 WEST TO 7.6 MILES SOUTH OF ROUTE 190 AND FROM 0.3 MILE SOUTH OF ROUTE 190 TO NEVADA STATE LINE
Contractor Name: HAT CREEK CONSTRUCTION & MATERIALS INC.
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2023-04-25-47
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Department Acceptance
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 04/25/2023
Date that the sample was received by the laboratory/organization performing the testing: 04/25/2023
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: Coldfeed
From where was the sample collected: Source
Laboratory sample identification: CF-16
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Wulfenstein Construction

Material Information

RAP Source: Wulfenstein Construction
Aggregate Size:
Aggregate Source:
RAP Stockpile: Continuous
Stockpile Size (tons):
Reclaimed Asphalt Pavement Mix Number:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2023-04-25-47-1AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)04/29/2023Not scheduledBrian YoungCT D09 - Bishop Field LaboratoryDerek Carrington