Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214640 DEA: 042J7204 EFIS: 0415000016
QA Service Level: 1
DIST-CO-RTE-PM: 04-CC-580-1.17
Work Description: STEGE DRAIN SUPER-STRUCTURE, PRECAST VOIDED SLABS
Location Description: CONTRA COSTA COUNTY IN RICHMOND FROM 0.3 MILE EAST OF STEGE DRAIN BRIDGE TO 0.3 MILE WEST OF BAYVIEW AVENUE OVERCROSSING
Contractor Name: GORDON N BALL INC
Contractor Address: 333 CAMILLE AVENUE, ALAMO CA 94507
Resident Engineer: Luis Melendez Structure Rep.: Laraine Woo
DIME Sample ID: 2023-04-12-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - FFS - Skid Testing
Sample Organization Contact: (916) 227-7287
Type of Sample: Department Acceptance
Type of Material: Roadway/Bridge Surface
Sample Taken Date: 04/12/2023
Date that the sample was received by the laboratory/organization performing the testing: 04/13/2023
The quantity of what the sample constitutes: bridge
A brief description of the sample: friction testing
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: 580
DIME Test ID: 2023-04-12-2-1
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/14/2023
Date Tested: 04/13/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: APPROACH
Test Result Compliance: complies
Additional Comments When Verified:
|
Pavement or Bridge Deck?
|
Bridge Deck
|
|
Average Coefficient of Friction
|
0.40
|
DIME Test ID: 2023-04-12-2-2
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/14/2023
Date Tested: 04/13/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: BRIDGE
Test Result Compliance: complies
Additional Comments When Verified:
|
Pavement or Bridge Deck?
|
Bridge Deck
|
|
Average Coefficient of Friction
|
0.43
|
DIME Test ID: 2023-04-12-2-3
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Verified Date: 04/14/2023
Date Tested: 04/13/2023
Submitted By Organization: CT HQ - FFS - Skid Testing
Organization Address: ,
Organization City:
Organization State:
Organization Zipcode:
Organization Email: steven.seifert@dot.ca.gov
Organization Phone: (916) 227-8588
General Comments for this Test: DEPARTURE
Test Result Compliance: complies
Additional Comments When Verified:
|
Pavement or Bridge Deck?
|
Bridge Deck
|
|
Average Coefficient of Friction
|
0.43
|