Print Report | Back to Sample Detail

Sample Record for 2023-02-10-56

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 QA Service Level: 1
DIST-CO-RTE-PM: 04-SON-1-15-15.7
Work Description: Construct roadway and bridge with structural concrete and CIDH piling
Location Description: District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7
Contractor Name: BRIDGEWAY CIVIL CONSTRUCTORS, INC.
Contractor Address: 4950 Allison Parkway, # A, Vacaville, CA 95688
Resident Engineer: Fabio La Serna Structure Rep.: Bunma Nou

Sample Information

DIME Sample ID: 2023-02-10-56
TL Number from the TL Form: 101402
Sample Submitted By Organization: CT D04 - Petaluma Field Laboratory
Sample Organization Contact: (510) 385-6841
Type of Sample: Quality Assurance
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 02/10/2023
Date that the sample was received by the laboratory/organization performing the testing: 02/10/2023
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: RAP
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Bodean - Santa Rosa

Material Information

RAP Source: Bodean Santa Rosa
Aggregate Size:
Aggregate Source:
RAP Stockpile: Continuous
Stockpile Size (tons):
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 2

DIME Test ID: 2023-02-10-56-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Submitted By Organization: CT D04 - Petaluma Field Laboratory
Organization Address: 1009 Clegg Court, Suite A,5675 Gibraltar Dr., Pleasanton, CA
Organization City: Petaluma
Organization State: CA
Organization Zipcode: 94954
Organization Email: glenn.cea@dot.ca.gov
Organization Phone: (510) 385-6841
This test has been superseded on 03/23/2023. The corrected test ID is: 2023-02-10-56-2
Reason: retested

Test 2 of 2

DIME Test ID: 2023-02-10-56-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 03/23/2023
Date Tested: 02/10/2023
Submitted By Organization: CT D04 - Petaluma Field Laboratory
Organization Address: 5675 Gibraltar Drive,
Organization City: Pleasanton
Organization State: CA
Organization Zipcode: 94588
Organization Email: glenn.cea@dot.ca.gov
Organization Phone: (510) 385-6841
General Comments for this Test: RAP lot 1 sublot 2
The test was superseded from test ID: 2023-02-10-56-1
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of the specimen basket assembly 3070.6 g
Mass of the specimen and specimen basket assembly prior to ignition 4990.5 g
Mass of HMA Sample prior to ignition 1919.9 g
Corrected Asphalt Binder Content 6.61 %
Mass Loss 130 g
Mass of aggregate remaining after ignition 1789.9 g
Correction Factor (Percent by mass of HMA Specimen) no data0 %
Moisture Content no data0 %
Temperature Compensation Factor 0.16 %
Test Temperature 900 F