Print Report | Back to Sample Detail

Sample Record for 2023-02-14-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993253 DEA: 033F0604 EFIS: 0312000052 QA Service Level: 1
DIST-CO-RTE-PM: 03-GLE-162-76.3/78.6
Work Description:
Location Description:
Contractor Name: GOLDEN STATE BRIDGE
Contractor Address: 3701 Mallard Drive, Benicia, CA 94510
Resident Engineer: Dustin Watts Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2023-02-14-4
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 02/14/2023
Date that the sample was received by the laboratory/organization performing the testing: 02/17/2023
The quantity of what the sample constitutes: 684
A brief description of the sample: #8 X 4' 11 1/2
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC HRC

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4125522
Hoop Manufacturer Lot Number(s): 15 18
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #8
Diameter of Hoop: 4'-11.5"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Steel AZ
Welding Company: CMC Rebar San Bernardino
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 8

DIME Test ID: 2023-02-14-4-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1158/25mm0.7978380.0999215Ok Neckingspaine
UTM 400kip
Temperature 72 f

Test 2 of 8

DIME Test ID: 2023-02-14-4-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2158/25mm0.7978637.4499541Ok Neckingspaine
UTM 400kip
Temperature 72 f

Test 3 of 8

DIME Test ID: 2023-02-14-4-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Broke in Heat Affected Area
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3158/25mm0.7978383.2699219Broke in Heat Affected Areaspaine
UTM 400kip
Temperature 72 f

Test 4 of 8

DIME Test ID: 2023-02-14-4-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4158/25mm0.7978096.3298856Ok Neckingspaine
UTM 400kip
Temperature 72 f

Test 5 of 8

DIME Test ID: 2023-02-14-4-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1188/25mm0.7978879.4599847Ok Neckingspaine
UTM 400kip
Temperature 72 f

Test 6 of 8

DIME Test ID: 2023-02-14-4-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Broke in Heat Affected Area
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2188/25mm0.7975205.5395197Broke in Heat Affected Areaspaine
UTM 400kip
Temperature 72 f

Test 7 of 8

DIME Test ID: 2023-02-14-4-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3188/25mm0.7979560.29100709Ok Neckingspaine
UTM 400kip
Temperature 72 f

Test 8 of 8

DIME Test ID: 2023-02-14-4-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 02/24/2023
Date Tested: 02/22/2023
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4188/25mm0.7979605.91100767Ok Neckingspaine
UTM 400kip
Temperature 72 f