Print Report | Back to Sample Detail

Sample Record for 2022-08-06-14

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB,BUT-70-25.5/25.8,0.0/3.8
Work Description: WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE.
Location Description: YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD
Contractor Name: Teichert Construction & MCM JV
Contractor Address: 4401 Duluth Ave, Rocklin, CA 95766
Resident Engineer: Anthony Granados Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2022-08-06-14
TL Number from the TL Form: 779489
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Assurance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 08/06/2022
Date that the sample was received by the laboratory/organization performing the testing: 11/02/2022
The quantity of what the sample constitutes: 1can
A brief description of the sample: PG64-16 Rubber Blend
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert and Sons

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number:
Sublot number:
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2022-08-06-14-1
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 11/22/2022
Date Tested: 11/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Determination Unworked Penetration
Unworked Penetration 29 0.1 mm

Test 2 of 3

DIME Test ID: 2022-08-06-14-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 11/22/2022
Date Tested: 11/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 73 C
Softening Point Sample 2 73 C
Bath Liquid freshly boiled distilled water
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2022-08-06-14-3
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 11/22/2022
Date Tested: 11/18/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Ball Penetration (P1) 8 mm
Final Dial reading (F1) 74 mm
Ball Penetration (P2) 3 mm
Final Dial reading (F2) 69 mm
Ball Penetration (P3) 4 mm
Final Dial reading (F3) 73 mm
Resilience 1 34 %
Resilience 2 34 %
Resilience 3 31 %
Average Resilience 33 %
Minutes Reaction no data