Print Report | Back to Sample Detail

Sample Record for 2022-09-08-59

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993162 DEA: 07319104 EFIS: 0716000017 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-91-R11.8
Work Description: ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP.
Location Description: LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR
Contractor Name: RV Concrete
Contractor Address: 605 E Commercial Street, Anaheim, CA 92801
Resident Engineer: Thang Ton Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-09-08-59
TL Number from the TL Form: 22-2379
Sample Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Sample Organization Contact: (213) 817-0387
Type of Sample: Department Acceptance
Type of Material: Concrete
Sample Taken Date: 09/08/2022
Date that the sample was received by the laboratory/organization performing the testing: 09/09/2022
The quantity of what the sample constitutes: 130 CY
A brief description of the sample: 6x12 concrete cylinders
From where was the sample collected: Job Site
Laboratory sample identification: 22-2379
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RVC

Material Information

The concrete mix design number: G3-19-PCC-172
The truck number from where the sample was collected: NA
The batch plant ticket number from where the sample was collected: 26003
Concrete batch plant: RVC
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: truck chute
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2022-09-08-59-2
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Verified Date: 10/21/2022
Date Tested: 10/20/2022
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 407-6963
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Unit system used? US Units
Number of specimens 3
Test performed With no density determined
Capped in accordance with? ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1 6.02 in
Average diameter of cylinder 2 6.02 in
Average diameter of cylinder 3 6.02 in
Cross sectional area of cylinder 1 28.46 in^2
Cross sectional area of cylinder 2 28.46 in^2
Cross sectional area of cylinder 3 28.46 in^2
Compressive strength (to nearest 10 psi) 3180 psi
Maximum load on cylinder 1 89129 lb
Maximum load on cylinder 2 92189 lb
Maximum load on cylinder 3 90276 lb
Compressive strength of cylinder 1 3131.7 psi
Type of fracture pattern of cylinder 1 2
Compressive strength of cylinder 2 3239.2 psi
Compressive strength of cylinder 3 3172 psi
Type of fracture pattern of cylinder 2 2
Type of fracture pattern of cylinder 3 2
Comment on any defect in either specimen or caps (Max 250 Characters) no data
Correction factor for cylinder 1 1
Correction factor for cylinder 2 1
Correction factor for cylinder 3 1
Age of specimen 42 days
Age of specimen in hours no data0 hours

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2022-09-08-59-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders10/12/202210/20/2022Robert AchuelaCT D07 - Materials Field Laboratory, Unit 1953Robert Achuela