Sample Record for 2022-09-30-18
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 212246 DEA: 053307A4 EFIS: 0514000027
QA Service Level: 1
DIST-CO-RTE-PM: 05-SLO-46-49.7/54.6
Work Description: Cholame Segment
Location Description:
Contractor Name: Atkinson Construction
Contractor Address: 18201 Von Karman - Suite 800, Irvine, CA 92612
Resident Engineer: Andrew Borrelli Structure Rep.: Dave Lewis
Sample Information
DIME Sample ID: 2022-09-30-18
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - Whitley Gardens Field Laboratory
Sample Organization Contact: 805-540-9933
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 09/30/2022
Date that the sample was received by the laboratory/organization performing the testing: 09/30/2022
The quantity of what the sample constitutes: Class 1 ASB Compaction 5 Shot
A brief description of the sample: Station 1150+30-1153+76@52'wide
From where was the sample collected: Job Site
Laboratory sample identification: 37057CL1ASB7
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Sierra Pacific - Avenal
Material Information
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Jobsite - Compacted Class 1 ASB
Where the material sample would have been placed if not sampled:
Test Results
Test 1 of 2
DIME Test ID: 2022-09-30-18-1
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Submitted By Organization: CT D05 - Whitley Gardens Field Laboratory
Organization Address: 102 Whitley Gardens Drive,
Organization City: Paso Robles
Organization State: CA
Organization Zipcode: 93446
Organization Email: kyle.engen@dot.ca.gov
Organization Phone: 805-540-9933
This test has been superseded on 09/30/2022. The corrected test ID is: 2022-09-30-18-2
Reason: retested
Test 2 of 2
DIME Test ID: 2022-09-30-18-2
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Verified Date: 09/30/2022
Date Tested: 09/30/2022
Submitted By Organization: CT D05 - Whitley Gardens Field Laboratory
Organization Address: 102 South Whitley Gardens Drive,
Organization City: Paso Robles
Organization State: CA
Organization Zipcode: 93346
Organization Email: kyle.engen@dot.ca.gov
Organization Phone: (805) 540-9933
General Comments for this Test:
The test was superseded from test ID: 2022-09-30-18-1
Test Result Compliance: complies
Additional Comments When Verified:
|
Is oversize material
|
No
|
|
In-place wet density
|
2.3
|
|
Highest adjust wet density
|
2.34
|
|
Relative compaction
|
98
|
|
% Moisture
|
no data
|
|
Optimum Moisture
|
no data
|