Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-10-0.0/13.2
Work Description: Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location Description: LA/SBD County Line to PM 13.2 near I-15
Contractor Name: Lane-Security Paving Joint Venture
Contractor Address: 3450 Centre Lake Drive, 1st Floor, Ontario, CA 91761
Resident Engineer: Jose Corona Structure Rep.: Luis Negrete
DIME Sample ID: 2022-09-28-20
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Sample Organization Contact: (760) 252-9216
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 09/28/2022
Date that the sample was received by the laboratory/organization performing the testing: 09/28/2022
The quantity of what the sample constitutes: 4710SQF
A brief description of the sample: SOIL
From where was the sample collected: Job Site
Laboratory sample identification: 09282022 TEST 03
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CTM 231 TEST LOCATION
The fabricator's/manufacturer's product name for the sample: omar G G
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: AT THE JOB SITE
Where the material sample would have been placed if not sampled:
DIME Test ID: 2022-09-28-20-1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Verified Date: 09/30/2022
Date Tested: 09/28/2022
Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Standard Count Density
|
2303 g/cc
|
Count or Density 1
|
2663 g/cc
|
Count or Density 2
|
2775 g/cc
|
Count or Density 3
|
2803 g/cc
|
Standard Count Moisture
|
815 g/cc
|
Moisture Count 1
|
141 g/cc
|
Moisture Count 2
|
179 g/cc
|
Moisture Count 3
|
175 g/cc
|
Sum of Count or Density
|
8241 g/cc
|
Average of Count or Density
|
2747 g/cc
|
Sum of Moisture Count
|
495 g/cc
|
Average of Moisture Count
|
165 g/cc
|
Count Ratio Density
|
1.19
|
Count Ratio Moisture
|
0.2
|
Calculated Percent Relative Compaction
|
97.1 %
|
Reported Percent Relative Compaction
|
97 %
|
DIME Test ID: 2022-09-28-20-2
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Verified Date: 09/30/2022
Date Tested: 09/28/2022
Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is oversize material
|
No
|
In-place wet density
|
2.02
|
Highest adjust wet density
|
2.08
|
Relative compaction
|
97
|
% Moisture
|
no data
|
Optimum Moisture
|
1.0 %
|