Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 040120T4 Cty SF Rte 80 PM 12.6/13.9 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Tom Larwin |
Date Reported: |
05/15/2015 |
|
Address: |
TL Number: |
Unknown |
||
City: |
||||
Project Name: CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES |
||||
Prime Contractor: CALIFORNIA ENGINEERING CONTRACTORS, INC. |
||||
Sample Taken Date: |
04/03/2015 |
Mix Design: |
152002 Native slurry |
|
Contractor: Unknown |
Location : THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 7.02 | 2.99 | 819.5 | 5753 | 1 |
2 | 7.07 | 3.00 | 776.1 | 5487 | 1 |
DIME Test ID: 2015-04-03-10-2
Number of specimens: 2
Compressive strength (to nearest 10 psi): 800
Age of specimen: 42 days
Certified By: Mike Mullins
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing