Sample Record for 2022-08-09-21
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 993771 DEA: 07325204 EFIS: 0716000082
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-210-R36.7/R37.1
Work Description: San Gabriel River Bridge - CM/GC Project - Hinge And Diaphragm Repairs
Location Description: Los Angeles County - LOS ANGELES COUNTY IN IRWINDALE FROM 0.2 MILE EAST OF 0.7 MILE WEST OF IRWINDALE AVENUE OVECROSSING
Contractor Name: FLATIRON WEST INC
Contractor Address: 14726 Ramona Avenue, Suite 300, Chino, CA 91710
Resident Engineer: Moe Izadpanah Structure Rep.: Quynh Nguyen
Sample Information
DIME Sample ID: 2022-08-09-21
TL Number from the TL Form:
Sample Submitted By Organization: CT METS QASI - Los Angeles Design Build Field Laboratory
Sample Organization Contact: (619) 204-7248
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 08/09/2022
Date that the sample was received by the laboratory/organization performing the testing: 08/17/2022
The quantity of what the sample constitutes: 1025 Couplers
A brief description of the sample: Standard Barlock Coupler
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier: 53-1867
Structure name: San Gabriel River Bridge
The fabricator/manufacturer/facility name: Pacific Steel Group
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: Bar-Lock Standard Couplers
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): Y3200/ 191875, 4000000952/ 191874
Rebar Heat Number(s): 236822
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2022-08-09-21-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 11/36mm | 2 | -0.0016 | 1.56 | 161461 | 103501 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
Large
|
Test 2 of 6
DIME Test ID: 2022-08-09-21-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 11/36mm | 2 | 0 | 1.56 | 162961 | 104462 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 3 of 6
DIME Test ID: 2022-08-09-21-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 11/36mm | 2 | 0 | 1.56 | 161618 | 103601 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 4 of 6
DIME Test ID: 2022-08-09-21-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 11/36mm | 1 | -0.002 | 1.56 | 157297 | 100831 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
Large
|
Test 5 of 6
DIME Test ID: 2022-08-09-21-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 11/36mm | 1 | 0 | 1.56 | 160929 | 103159 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 6 of 6
DIME Test ID: 2022-08-09-21-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 08/18/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 11/36mm | 1 | 0 | 1.56 | 163158 | 104589 | service splice | spaine |
| |
|
UTM
|
2000kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|