Print Report | Back to Sample Detail

Sample Record for 2022-07-13-74

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 993235 DEA: 051H4504 EFIS: 0516000075 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-154-R31.8/R32.1
Work Description: CONSTRUCT CIDH CONCRETE PILES AND STRUCTURAL CONCRETE BRIDGE.
Location Description: SANTA BARBARA COUNTY IN AND NEAR SANTA BARBARA FROM PRIMAVERA ROAD UNDERCROSSING TO LA COLINA ROAD UNDERCROSSING
Contractor Name: CA Rasmussen
Contractor Address: 28548 LIVINGSTON AVENUE, VALENICA CA 91355
Resident Engineer: Jeffery Finn Structure Rep.: Emiliano Berntsen

Sample Information

DIME Sample ID: 2022-07-13-74
TL Number from the TL Form: 919457
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Department Acceptance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 07/13/2022
Date that the sample was received by the laboratory/organization performing the testing: 08/04/2022
The quantity of what the sample constitutes: 2 cans
A brief description of the sample: Rubber binder 64-16
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: San Joaquin Refinery

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number:
Sublot number:
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2022-07-13-74-1
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 08/17/2022
Date Tested: 08/17/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Determination Unworked Penetration
Unworked Penetration 42 0.1 mm

Test 2 of 3

DIME Test ID: 2022-07-13-74-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 08/17/2022
Date Tested: 08/16/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 66 C
Softening Point Sample 2 66 C
Bath Liquid freshly boiled distilled water
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2022-07-13-74-3
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 08/17/2022
Date Tested: 08/17/2022
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Ball Penetration (P1) 6 mm
Final Dial reading (F1) 73 mm
Ball Penetration (P2) 1 mm
Final Dial reading (F2) 70 mm
Ball Penetration (P3) 2 mm
Final Dial reading (F3) 72 mm
Resilience 1 33 %
Resilience 2 31 %
Resilience 3 30 %
Average Resilience 31 %
Minutes Reaction no data