Print Report | Back to Sample Detail

Sample Record for 2022-02-23-4

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214337 DEA: 080E33U4 EFIS: 0817000075 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-115-R7.3/R10.0
Work Description: ADD WB AUX & EB DECEL LANES, WIDEN I15 SW CONNECT,RAMPS/BRDG
Location Description: SAN BERNARDINO COUNTY IN ONTARIO FROM 0.2 MILE WEST OF CUCAMONGA CREEK BRIDGE TO MILLIKEN AVENUE
Contractor Name: Ames Construction
Contractor Address: 391 North Main Street, Suite 302, Corona, CA 92880
Resident Engineer: Denise Sostrom Structure Rep.: Matt Bruce

Sample Information

DIME Sample ID: 2022-02-23-4
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 02/23/2022
Date that the sample was received by the laboratory/organization performing the testing: 02/25/2022
The quantity of what the sample constitutes: 8 hoops from lot 1 and 3
A brief description of the sample: #6 hoop 2'-6" diameter
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 1201036646
Hoop Manufacturer Lot Number(s): Lot 1 and 3
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 2'-6"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 6

DIME Test ID: 2022-02-23-4-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
116/19mm0.4440483.8292009Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 2 of 6

DIME Test ID: 2022-02-23-4-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
216/19mm0.4442217.2495948Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 3 of 6

DIME Test ID: 2022-02-23-4-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
316/19mm0.4440482.3292005Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 4 of 6

DIME Test ID: 2022-02-23-4-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
136/19mm0.4440626.9392334Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 5 of 6

DIME Test ID: 2022-02-23-4-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
236/19mm0.4440592.3592255Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 6 of 6

DIME Test ID: 2022-02-23-4-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/03/2022
Date Tested: 03/02/2022
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
336/19mm0.4440574.5792215Ok Neckingbewing
UTM 400kip
Temperature 72 f