Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214486 DEA: 080K1224 EFIS: 0815000244
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-15-R28.6/37.5
Work Description: REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT
Location Description: SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING
Contractor Name: SULLY - MILLER CONTRACTING COMPANY
Contractor Address: 135 S STATE COLLEGE BLVD. 400, BREA, CA 92821
Resident Engineer: Larry J Canuti Structure Rep.: Taghreed Al-khateeb
DIME Sample ID: 2021-11-08-20
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Asphalt Binder
Sample Taken Date: 11/08/2021
Date that the sample was received by the laboratory/organization performing the testing: 11/09/2021
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0623-21
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Blue Diamond-Victorville
Performance Grade: PG 64-28 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2021-11-08-20-4
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
Original binder
|
|
Phase Angle (δ) (for the 10 cycles)
|
58.7 degree
|
|
Dynamic Shear, G*/sin(δ)
|
1.81 kPa
|
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2021-11-08-20-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
RTFO residue
|
|
Phase Angle (δ) (for the 10 cycles)
|
65.7 degree
|
|
Dynamic Shear, G*/sin(δ)
|
2.68 kPa
|
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2021-11-08-20-1
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
DIME Test ID: 2021-11-08-20-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is mass change based on one or two containers?
|
Two
|
|
Any material loss from containers during heating process/testing?
|
Yes
|
|
Mass of empty container #1
|
169.38 grams
|
|
Mass of empty container #2
|
166.192 grams
|
|
Mass of container #1 before test (m1i)
|
204.355 grams
|
|
Mass of container #2 before test (m2i)
|
201.193 grams
|
|
Mass of container #1 after test (m1f)
|
204.209 grams
|
|
Mass of container #2 after test (m2f)
|
201.046 grams
|
|
Average mass change
|
-0.419 percent
|
DIME Test ID: 2021-11-08-20-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Was test performed on residue from distillation or evaporation?
|
Distillation
|
|
Soluble, percent
|
99.8 %
|
|
Insoluble, percent
|
0.1 %
|
DIME Test ID: 2021-11-08-20-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 11/16/2021
Date Tested: 11/12/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
|
Time of test
|
08:01 HH:MM
|
|
Test Temperature
|
135 C
|
|
Speed
|
20 rpm
|
|
Spindle size
|
21 in
|
|
Torque
|
51 %
|
|
Viscosity reading #1 (A)
|
1.246 Pa-s
|
|
Viscosity reading #2 (B)
|
1.252 Pa-s
|
|
Viscosity reading #3 (C)
|
1.249 Pa-s
|
|
Average viscosity
|
1.249 Pa-s
|
DIME Test ID: 2021-11-08-20-7
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 01/26/2022
Date Tested: 11/17/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
% Elongation Recovery
|
93 %
|
DIME Test ID: 2021-11-08-20-8
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 01/26/2022
Date Tested: 12/23/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Phase
|
PAV residue
|
|
Test Plate Diameter
|
8 mm
|
|
Phase Angle (δ) (for the 10 cycles)
|
56.1 degree
|
|
(G*) x sin(δ)=
|
1490 kPa
|
DIME Test ID: 2021-11-08-20-9
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 01/26/2022
Date Tested: 12/23/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Time test started
|
no data HH:MM:SS
|
|
Flags issued by software during test
|
no data
|
|
Correlation coefficient (R²)
|
no data0
|
|
Regression coefficient a
|
no data
|
|
Regression coefficient b
|
no data
|
|
Regression coefficient c
|
no data
|
|
Load at time 0.0
|
no data0 mN
|
|
Deflection at time 0.0 s
|
no data0 µm
|
|
Load at time 0.5 s
|
no data0 mN
|
|
Deflection at time 0.5 s
|
no data0 µm
|
|
Load at 60.0 s
|
no data0 mN
|
|
Beam deflection 60.0 s
|
no data0 µm
|
|
Measured Stiffness Modulus 60.0 s
|
155 mPa
|
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
|
Difference between stiffness moduli 60.0 s
|
no data
|
|
Estimated m-value 60.0 s
|
0.339
|