Sample Record for 2021-07-14-50
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 212896 DEA: 04160304 EFIS: 0400000429
QA Service Level: 1
DIST-CO-RTE-PM: 04-ALA-84-13.1/13.5
Work Description: NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT
Location Description: IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036).
Contractor Name: VIKING CONSTRUCTION COMPANY, INC.
Contractor Address: 11315 Sunrise Gold Circle, Suite A, Rancho Cordova, CA 95742
Resident Engineer: Yannaing Tun (Abeer Dahhan) Structure Rep.: Oanh Bui
Sample Information
DIME Sample ID: 2021-07-14-50
TL Number from the TL Form:
Sample Submitted By Organization: RMA Group - Rancho Cordova
Sample Organization Contact: (916) 631-7194
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 07/14/2021
Date that the sample was received by the laboratory/organization performing the testing: 07/14/2021
The quantity of what the sample constitutes: 100 cy
A brief description of the sample: Concrete
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Mathews Readymix
Material Information
The concrete mix design number: DDJSP8Q3
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: 18233492
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: 4 Piles for Abutment 1
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:
Test Results
Test 1 of 4
DIME Test ID: 2021-07-14-50-1
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Verified Date: 04/13/2022
Date Tested: 07/14/2021
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Test 2 of 4
DIME Test ID: 2021-07-14-50-2
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Verified Date: 04/13/2022
Date Tested: 07/14/2021
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Test 3 of 4
DIME Test ID: 2021-07-14-50-3
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Verified Date: 04/13/2022
Date Tested: 07/14/2021
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Test 4 of 4
DIME Test ID: 2021-07-14-50-4
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Verified Date: 04/13/2022
Date Tested: 07/14/2021
Submitted By Organization: RMA Group - Rancho Cordova
Organization Address: 3150 Fitzgerald Road,
Organization City: Rancho Cordova
Organization State: CA
Organization Zipcode: 95742
Organization Email: mlowrance@rmacompanies.com
Organization Phone: (916) 631-7194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Unit weight of the concrete
|
no data0 lb/ft^3
|
Cement content
|
no data0 lb/yd^3
|