Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 030F2844 Cty SAC Rte 99 PM 7.1/9.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Masoud Saed |
Date Reported: |
11/23/2020 |
|
Address: |
TL Number: |
280819 |
||
City: |
||||
Project Name: Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments |
||||
Prime Contractor: GRANITE CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
11/09/2020 |
Mix Design: |
201 |
|
Contractor: Unknown |
Location : |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 5.97 | 27.99 | 173090 | 6184.0 | 1 |
2 | 5.98 | 28.09 | 177731 | 6327.2 | 1 |
DIME Test ID: 2020-11-09-23-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 6260
Comment on any defect in either specimen or caps (Max 250 Characters):
Age of specimen: 14 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing