Print Report | Back to Sample Detail

Sample Record for 2020-10-27-10

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213525 DEA: 010A0404 EFIS: 0100020013 QA Service Level: 1
DIST-CO-RTE-PM: 01-LAK-175-R25.0/27.5
Work Description: Putah Creek Bridge Widen +1 + 2RCBs
Location Description: LAKE COUNTY AT AND NEAR MIDDLETOWN FROM 0.1 MILE EAST OF PUTAH CREEK BRIDGE TO DRY CREEK BRIDGE
Contractor Name: GHILOTTI CONSTRUCTION CO. INC.
Contractor Address: 246 GHILOTTI AVENUE, SANTA ROSA, CA 95407
Resident Engineer: Dan Kraft Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2020-10-27-10
TL Number from the TL Form: 827405
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Department Acceptance
Type of Material: Asphalt Rubber Binder
Sample Taken Date: 10/27/2020
Date that the sample was received by the laboratory/organization performing the testing: 11/04/2020
The quantity of what the sample constitutes: 1 can
A brief description of the sample: RHMA #1 test
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: BoDean Company Santa Rosa

Material Information

Asphalt modifier supplier:
Performance Grade: PG 64-16
Lot number: 1
Sublot number: 1
Asphalt Rubber Binder Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2020-10-27-10-1
Test Method: ASTM D217-16: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Verified Date: 03/22/2021
Date Tested: 11/20/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified:
Determination Worked Penetration
Worked Penetration 26 0.1 mm

Test 2 of 3

DIME Test ID: 2020-10-27-10-2
Test Method: ASTM D36-14ε1: Standard Test Method for Softening Point of Bitumen (Ring-and-Ball Apparatus) (Softening Point)
Verified Date: 11/20/2020
Date Tested: 11/20/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified:
ASTM Thermometer used? C
Softening Point Sample 1 74 C
Softening Point Sample 2 74 C
Bath Liquid USP glycerin
Minutes Reaction no data

Test 3 of 3

DIME Test ID: 2020-10-27-10-3
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Verified Date: 11/20/2020
Date Tested: 11/20/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified:
Temperature 25 C
Ball Penetration (P1) no data0 mm
Final Dial reading (F1) 76 mm
Ball Penetration (P2) no data0 mm
Final Dial reading (F2) 74 mm
Ball Penetration (P3) no data0 mm
Final Dial reading (F3) 74 mm
Resilience 1 24 %
Resilience 2 26 %
Resilience 3 26 %
Average Resilience 25 %
Minutes Reaction no data