Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 213733 DEA: 051C85U4 EFIS: 0518000156
QA Service Level: 1
DIST-CO-RTE-PM: 05-SCR-1-10.2/17.5
Work Description: Santa Cruz 1 CAPM and Bridge Rails
Location Description: SANTA CRUZ COUNTY IN AND NEAR SANTA CRUZ FROM NORTH APTOS UNDERPASS TO JUNCTION ROUTE 9.
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 585 West Beach Street, Watsonville, CA 95076
Resident Engineer: Gareth Gill Structure Rep.: Unknown
DIME Sample ID: 2020-07-13-38
TL Number from the TL Form:
Sample Submitted By Organization: CT D05 - San Luis Obispo District Laboratory
Sample Organization Contact: (559) 230-3109
Type of Sample: Department Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 07/13/2020
Date that the sample was received by the laboratory/organization performing the testing: 07/15/2020
The quantity of what the sample constitutes: 2 boxes
A brief description of the sample: 3/4" RHMA-G
From where was the sample collected: Manufacturer
Laboratory sample identification: 20-A-148
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Salinas Batch
DIME Test ID: 2020-07-13-38-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 07/21/2020
Date Tested: 07/17/2020
Submitted By Organization: CT D05 - San Luis Obispo District Laboratory
Organization Address: 50 Higuera Street,
Organization City: San Luis Obispo
Organization State: CA
Organization Zipcode: 93401
Organization Email: glenn.johnson@dot.ca.gov
Organization Phone: (805) 549-3158
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used?
|
Fahrenheit
|
Test procedure used?
|
Method A
|
Mass of HMA Sample prior to ignition
|
no data
|
Corrected Asphalt Binder Content
|
7.29 %
|
Mass Loss
|
no data
|
Correction Factor (Percent by mass of HMA Specimen)
|
no data
|
Moisture Content
|
no data
|
Temperature Compensation Factor
|
no data
|
Test Temperature
|
no data
|