Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 66667 DEA: JMFPP EFIS: 0019000043
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2020-05-04-12
TL Number from the TL Form:
Sample Submitted By Organization: Teichert Materials - Sacramento
Sample Organization Contact: (916) 386-6974
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 05/04/2020
Date that the sample was received by the laboratory/organization performing the testing: 05/04/2020
The quantity of what the sample constitutes: JMF Prequalification Program
A brief description of the sample: 1/2" Recycled Asphalt Pavement
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Teichert Materials Vernalis
RAP Source: Teichert Materials Vernalis
Aggregate Size: Unknown
Aggregate Source: Unknown
RAP Stockpile: Static
Stockpile Size (tons): Unknown
Reclaimed Asphalt Pavement Mix Number:
DIME Test ID: 2020-05-04-12-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 05/05/2020
Date Tested: 05/05/2020
Submitted By Organization: Teichert Materials - Sacramento
Organization Address: 3500 American River Drive,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95864
Organization Email: egifford@teichert.com
Organization Phone: (916) 386-6974
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
no data0 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
96 %
|
Cumulative percent passing the 3/8 in. sieve
|
90 %
|
Cumulative percent passing the 1/4 in. sieve
|
no data0 %
|
Cumulative percent passing the #4 sieve
|
66 %
|
Cumulative percent passing the #8 sieve
|
50 %
|
Cumulative percent passing the #16 sieve
|
35 %
|
Cumulative percent passing the #30 sieve
|
27 %
|
Cumulative percent passing the #50 sieve
|
20 %
|
Cumulative percent passing the #100 sieve
|
13 %
|
Cumulative percent passing the #200 sieve
|
8.8 %
|
DIME Test ID: 2020-05-04-12-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 05/05/2020
Date Tested: 05/05/2020
Submitted By Organization: Teichert Materials - Sacramento
Organization Address: 3500 American River Drive,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95864
Organization Email: egifford@teichert.com
Organization Phone: (916) 386-6974
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
What temperature unit is used?
|
Fahrenheit
|
Test procedure used?
|
Method A
|
Mass of HMA Sample prior to ignition
|
no data
|
Corrected Asphalt Binder Content
|
7.31 %
|
Mass Loss
|
no data
|
Correction Factor (Percent by mass of HMA Specimen)
|
no data
|
Moisture Content
|
no data
|
Temperature Compensation Factor
|
no data
|
Test Temperature
|
no data
|
DIME Test ID: 2020-05-04-12-3
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 05/05/2020
Date Tested: 05/05/2020
Submitted By Organization: Teichert Materials - Sacramento
Organization Address: 3500 American River Drive,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95864
Organization Email: egifford@teichert.com
Organization Phone: (916) 386-6974
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
96 %
|
Cumulative percent passing the 3/8 in. sieve
|
90 %
|
Cumulative percent passing the 1/4 in. sieve
|
no data0 %
|
Cumulative percent passing the #4 sieve
|
66 %
|
Cumulative percent passing the #8 sieve
|
50 %
|
Cumulative percent passing the #16 sieve
|
35 %
|
Cumulative percent passing the #30 sieve
|
27 %
|
Cumulative percent passing the #50 sieve
|
20 %
|
Cumulative percent passing the #100 sieve
|
13 %
|
Cumulative percent passing the #200 sieve
|
8.8 %
|