Sample Record for 2019-12-20-9
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213444 DEA: 060Q2804 EFIS: 0613000051
QA Service Level: 1
DIST-CO-RTE-PM: 06-KER-99,178-23.8/R28.4,0.1
Work Description: RECONSTRUCT LANES AND SHOULDERS WITH CRCP, MODIFYING ELECTRICAL SYSTEM
Location Description: KERN COUNTY IN BAKERSFIELD ON ROUTE 99 FROM 0.3 MILE SOUTH OF PALM AVENUE OVERCROSSING TO BEARDSLEY CANAL BRIDGE AND ON ROUTE 178 AT ROUTE 99/178 SEPARATION
Contractor Name: BROSAMER & WALL, INC.
Contractor Address: 1777 Oakland Blvd., Suite 300, Walnut Creek, CA 94596
Resident Engineer: Hugo Camberos Structure Rep.: Luis Melendez
Sample Information
DIME Sample ID: 2019-12-20-9
TL Number from the TL Form: C571209
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 12/20/2019
Date that the sample was received by the laboratory/organization performing the testing: 12/26/2019
The quantity of what the sample constitutes: 8
A brief description of the sample: Couplers
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 6
Coupler Model: Bar Lock L Series
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): MM18108718
Rebar Heat Number(s): 4092342, 4092343
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2019-12-20-9-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 6/19mm | 1 | -0.0016 | 0.44 | 41515 | 94352 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
Small
|
Test 2 of 6
DIME Test ID: 2019-12-20-9-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 6/19mm | 1 | 0 | 0.44 | 41997 | 95447 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 3 of 6
DIME Test ID: 2019-12-20-9-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 6/19mm | 1 | 0 | 0.44 | 42503 | 96598 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 4 of 6
DIME Test ID: 2019-12-20-9-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | | No. 6/19mm | 2 | -0.0026 | 0.44 | 42473 | 96530 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
Small
|
Test 5 of 6
DIME Test ID: 2019-12-20-9-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | | No. 6/19mm | 2 | 0 | 0.44 | 38710 | 87977 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|
Test 6 of 6
DIME Test ID: 2019-12-20-9-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 12/27/2019
Date Tested: 12/27/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples Tested
|
1
|
| Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | | No. 6/19mm | 2 | 0 | 0.44 | 42575 | 96760 | Service Splice | bewing |
| |
|
UTM
|
400kip
|
|
Temperature
|
72.00 f
|
|
Halo ID
|
|