Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 032F3404 Cty PLA Rte 49 PM 3.1/7.5 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Jeff Johnson |
Date Reported: |
10/30/2019 |
|
Address: |
TL Number: |
204508 |
||
City: |
||||
Project Name: WIDEN SHOULDERS, ADD RETAINING WALLS, REPLACE MBGR, CURBS & ELECTRICAL |
||||
Prime Contractor: FLATIRON WEST INC |
||||
Sample Taken Date: |
10/02/2019 |
Mix Design: |
00000 |
|
Contractor: Unknown |
Location : PLACER COUNTY IN AND NEAR AUBURN FROM 0.1 MILE SOUTH OF ROUTE 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.00 | 28.26 | 97786 | 3460.2 | 1 |
2 | 6.01 | 28.35 | 98488 | 3474.0 | 1 |
DIME Test ID: 2019-10-02-19-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 3470
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing