Sample Record for 2019-09-13-3
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213856 DEA: 112888U4 EFIS: 1118000199
QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-11,125,905-Various
Work Description: CONSTRUCT FREEWAY TO FREEWAY CONNECTORS AND 4-LANE HIGHWAY FACILITY
Location Description: SAN DIEGO COUNTY AT VARIOUS LOCATIONS
Contractor Name: Skanska USA Civil West CA
Contractor Address: 1995 Agua Mansa Road, Riverside, CA 92509
Resident Engineer: Carlos Covarrubias Structure Rep.: Wade Durant
Sample Information
DIME Sample ID: 2019-09-13-3
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 09/13/2019
Date that the sample was received by the laboratory/organization performing the testing: 09/14/2019
The quantity of what the sample constitutes: 8
A brief description of the sample: #14 HRC 500/510
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC Gerdau
Intermediate Assembler or Fabricator:
Rebar Size: 14
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 74113607 62144586 73112054 74112219
Rebar Heat Number(s): 033695
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2019-09-13-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar NBroke. Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 14/43mm | 1 | -0.0182 | 2.25 | 211650 | 94067 | Bar NBroke. Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Large
|
Test 2 of 6
DIME Test ID: 2019-09-13-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke. Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 14/43mm | 1 | 0 | 2.25 | 210983 | 93770 | Bar Broke. Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 6
DIME Test ID: 2019-09-13-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke, Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 14/43mm | 1 | 0 | 2.25 | 210613 | 93606 | Bar Broke, Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 4 of 6
DIME Test ID: 2019-09-13-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke, Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 14/43mm | 6 | -0.0068 | 2.25 | 209838 | 93261 | Bar Broke, Ok Necking | |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Large
|
Test 5 of 6
DIME Test ID: 2019-09-13-3-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke, Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 14/43mm | 6 | 0 | 2.25 | 206484 | 91771 | Bar Broke, Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 6 of 6
DIME Test ID: 2019-09-13-3-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 09/16/2019
Date Tested: 09/14/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke, Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 14/43mm | 6 | 0 | 2.25 | 206298 | 91688 | Bar Broke, Ok Necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|