Sample Record for 2019-08-01-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 208973 DEA: 120H1004 EFIS: 1200000180 COOP: 120670
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-405,73,405,605-9.3/24.3
Work Description: (Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location Description: Orange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
Contractor Name: OC 405 Partners
Contractor Address: 3100 W Lake Center Dr, Santa Ana, CA 92704
Resident Engineer: Hank Alonso (reports) Structure Rep.: Alex Angha (reports)
Sample Information
DIME Sample ID: 2019-08-01-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Control
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 08/01/2019
Date that the sample was received by the laboratory/organization performing the testing: 08/06/2019
The quantity of what the sample constitutes: 219 total Lot 1 and 2
A brief description of the sample: #7 UBS Hoops
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Etiwanda
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4084831
Hoop Manufacturer Lot Number(s): 1 and 2
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 7
Diameter of Hoop: 6'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC - Arizona
Welding Company: CMC Rebar (Etiwanda)
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results