Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 033F5304 Cty ED Rte 50 PM 67.3 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Nathan Alterton |
Date Reported: |
07/31/2019 |
|
Address: |
TL Number: |
0001 |
||
City: |
||||
Project Name: ECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE |
||||
Prime Contractor: Q & D CONSTRUCTION, INC |
||||
Sample Taken Date: |
07/02/2019 |
Mix Design: |
000000 |
|
Contractor: Unknown |
Location : EL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 2.99 | 7.02 | 113192 | 16124.2 | 1 |
2 | 3.00 | 7.07 | 121975 | 17252.5 | 1 |
3 | 3.00 | 7.07 | 117622 | 16636.8 | 1 |
DIME Test ID: 2019-07-02-32-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 16670
Age of specimen: 28 days
Certified By: Bang Nguyen
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing