Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 033F5304 Cty ED Rte 50 PM 67.3 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Nathan Alterton |
Date Reported: |
06/04/2019 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: ECHO SUMMIT BRIDGE IS A 24-FT WIDE, THREE-SPAN, REINFORCED CONCRETE GIRDER BRIDGE |
||||
Prime Contractor: Q & D CONSTRUCTION, INC |
||||
Sample Taken Date: |
05/07/2019 |
Mix Design: |
JS1212 |
|
Contractor: Unknown |
Location : EL DORADO COUNTY NEAR MEYERS AT ECHO SUMMIT SIDEHILL VIADUCT |
|||
Structure unique identifier: 09-El dorado |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 3.01 | 7.12 | 131512 | 18470.8 | 1 |
2 | 3.01 | 7.12 | 130902 | 18385.1 | 1 |
3 | 3.01 | 7.12 | 129281 | 18157.4 | 1 |
DIME Test ID: 2019-05-07-11-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 18340
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing