Sample Record for 2019-05-31-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213469 DEA: 024C40V4 EFIS: 0218000125
QA Service Level: 1
DIST-CO-RTE-PM: 02-SHA-5-R3.8/R11.7
Work Description: WIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB
Location Description: SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING
Contractor Name: J.F. SHEA CONSTRUCTION
Contractor Address: P.O. BOX 494519, REDDING, CA 96049-4519
Resident Engineer: Henry Benner Structure Rep.: Eric Chaffee
Sample Information
DIME Sample ID: 2019-05-31-2
TL Number from the TL Form: NA
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 05/31/2019
Date that the sample was received by the laboratory/organization performing the testing: 05/31/2019
The quantity of what the sample constitutes: 4
A brief description of the sample: Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC HRC
Material Information
Production or Authorization Testing: Authorization Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 11
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 189111, 73112680
Rebar Heat Number(s): 4077835
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2019-05-31-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | No. 11/36mm | 1.56 | 0 | 153156 | 98177 | | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|
Test 2 of 6
DIME Test ID: 2019-05-31-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | No. 11/36mm | 1.56 | -0.0057 | 153311 | 98276 | | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|
Test 3 of 6
DIME Test ID: 2019-05-31-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | No. 11/36mm | 1.56 | 0 | 153051 | 98110 | | bewing |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|
Test 4 of 6
DIME Test ID: 2019-05-31-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/04/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 2 | No. 11/36mm | 1.56 | 0 | 146980 | 94218 | OK Necking | fsaylor |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|
Test 5 of 6
DIME Test ID: 2019-05-31-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/04/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 2 | No. 11/36mm | 1.56 | -0.0146 | 160231 | 102712 | OK Necking | fsaylor |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|
Test 6 of 6
DIME Test ID: 2019-05-31-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Verified Date: 06/04/2019
Date Tested: 06/04/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 2 | No. 11/36mm | 1.56 | 0 | 160239 | 102718 | OK Necking | fsaylor |
| |
Temperature
|
72.00 f
|
UTM
|
2000kip
|
Halo ID
|
Large
|