Print Report | Back to Sample Detail

Sample Record for 2019-04-24-23

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-04-24-23
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 04/24/2019
Date that the sample was received by the laboratory/organization performing the testing: 04/24/2019
The quantity of what the sample constitutes: JMFPP
A brief description of the sample: Combined RAP
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Construction Company

Material Information

RAP Source: Granite Construction
Aggregate Size: Unknown
Aggregate Source: Unknown
RAP Stockpile:
Stockpile Size (tons): Unknown
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 2

DIME Test ID: 2019-04-24-23-1
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 04/29/2019
Date Tested: 02/11/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: AASHTO T 30 RAP Gradation Sample 4
Test Result Compliance:
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 100 %
Cumulative percent passing the 1/4 in. sieve 100 %
Cumulative percent passing the #4 sieve 76 %
Cumulative percent passing the #8 sieve 53 %
Cumulative percent passing the #16 sieve 38 %
Cumulative percent passing the #30 sieve 29 %
Cumulative percent passing the #50 sieve 21 %
Cumulative percent passing the #100 sieve 15 %
Cumulative percent passing the #200 sieve 10 %

Test 2 of 2

DIME Test ID: 2019-04-24-23-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 04/29/2019
Date Tested: 02/11/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: AASHTO T 308 RAP Binder Content Sample 4
Test Result Compliance:
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of HMA Sample prior to ignition no data
Corrected Asphalt Binder Content 6.63 %
Mass Loss no data
Correction Factor (Percent by mass of HMA Specimen) no data
Moisture Content no data
Temperature Compensation Factor no data
Test Temperature no data