Print Report | Back to Sample Detail

Sample Record for 2019-01-04-27

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-01-04-27
TL Number from the TL Form: Unknown
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 01/04/2019
Date that the sample was received by the laboratory/organization performing the testing: 01/10/2019
The quantity of what the sample constitutes: 1
A brief description of the sample: JMF 1/2 Aggregate Qualities
From where was the sample collected: Source
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Materials - Pleasanton

Material Information

RAP Source: Vulcan materials
Aggregate Size: 1/2
Aggregate Source: Vulcan materials
RAP Stockpile: Continuous
Stockpile Size (tons): Unknown
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test

DIME Test ID: 2019-01-04-27-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 03/25/2019
Date Tested: 01/04/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: Rap sample 1 (t-308)
Test Result Compliance:
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of HMA Sample prior to ignition no data
Corrected Asphalt Binder Content 5.45 %
Mass Loss no data
Correction Factor (Percent by mass of HMA Specimen) no data
Moisture Content no data
Temperature Compensation Factor no data
Test Temperature no data

Test

DIME Test ID: 2019-01-04-27-2
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 03/25/2019
Date Tested: 01/04/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (530) 713-6823
General Comments for this Test: rap sample 1 t30
Test Result Compliance:
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 93.4 %
Cumulative percent passing the 3/8 in. sieve 85 %
Cumulative percent passing the 1/4 in. sieve 85 %
Cumulative percent passing the #4 sieve 65.4 %
Cumulative percent passing the #8 sieve 49 %
Cumulative percent passing the #16 sieve 34.8 %
Cumulative percent passing the #30 sieve 23.5 %
Cumulative percent passing the #50 sieve 14.2 %
Cumulative percent passing the #100 sieve 7.9 %
Cumulative percent passing the #200 sieve 4.3 %