Sample Record for 2018-12-19-8
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 3807 DEA: 07121844 EFIS: 0700000117
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-5-42.8/47.3
Work Description: CONSTRUCT HOV LANES, RETAINING WALLS AND SOUND WALLS.
Location Description: LOS ANGELES COUNTY IN LOS ANGELES, GLENDALE, AND BURBANK FROM ROUTE 5/134 SEPARATION TO MAGNOLIA BOULEVARD OVERCROSSING
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 13170 TELFAIR AVENUE, SYLMAR, CA 91342
Resident Engineer: James Shih Structure Rep.: Matthew Remo
Sample Information
DIME Sample ID: 2018-12-19-8
TL Number from the TL Form: C686048 C686049
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 12/19/2018
Date that the sample was received by the laboratory/organization performing the testing: 01/02/2019
The quantity of what the sample constitutes: 8
A brief description of the sample: Transition DoubleBarrel Zap couplers
From where was the sample collected: Fabricator
Laboratory sample identification: Unknown
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: BarSplice Gerdau
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Gerdau
Coupler Manufacturer: BarSplice Transition
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 5
Coupler Model: BarSplice Transition
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 8026
Rebar Heat Number(s): 65032640 65032743
Rebar Size 2 : 6
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2018-12-19-8-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | C686049 | #5 - #6 Transition | 0.31 | 31770 | 102480 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
Test 2 of 6
DIME Test ID: 2018-12-19-8-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | C686049 | #5 - #6 Transition | 0.31 | 31900 | 102900 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
Test 3 of 6
DIME Test ID: 2018-12-19-8-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | C686049 | #5 - #6 Transition | 0.31 | 31360 | 101160 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
Test 4 of 6
DIME Test ID: 2018-12-19-8-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 1 | C686048 | #5 - #6 Transition | 0.31 | 31160 | 100520 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
Test 5 of 6
DIME Test ID: 2018-12-19-8-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 2 | C686048 | #5 - #6 Transition | 0.31 | 31560 | 101810 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|
Test 6 of 6
DIME Test ID: 2018-12-19-8-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/03/2019
Date Tested: 01/03/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke; OK Necking
Test Result Compliance:
Additional Comments When Verified:
|
Number of Samples
|
1
|
| Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | | 3 | C686048 | #5 - #6 Transition | 0.31 | 31590 | 101900 | Bar Broke | Brian |
| |
|
UTM
|
400KIP
|
|
Temperature
|
72 F
|