Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # SMTL-STOCK Cty Rte PM Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Unknown |
Date Reported: |
12/04/2018 |
|
Address: |
TL Number: |
11111111 |
||
City: |
||||
Project Name: Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680. |
||||
Prime Contractor: Not set |
||||
Sample Taken Date: |
11/27/2018 |
Mix Design: |
xxxxxxxxxxxxxx |
|
Contractor: Unknown |
Location : |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.01 | 28.37 | 129560 | 4566.8 | 1 |
2 | 6.02 | 28.46 | 126111 | 4431.2 | 1 |
DIME Test ID: 2018-11-27-4-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4500
Age of specimen: 7 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing