Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 042640N4 Cty MRN Rte 101 PM MRN27.0/27.6SON0.0/4.5 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Hal Streater |
Date Reported: |
11/29/2018 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: CONSTRUCT HOV LANES |
||||
Prime Contractor: GHILOTTI CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
11/01/2018 |
Mix Design: |
4201A |
|
Contractor: Unknown |
Location : MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING |
|||
Structure unique identifier: RW 95 |
||||
Structure name: Retaining Wall 95 |
||||
Location of Pour: RW 3 Stem Wall |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.37 | 6.01 | 5000.4 | 141862 | 1 |
2 | 28.46 | 6.02 | 4884.6 | 139016 | 1 |
DIME Test ID: 2018-11-01-9-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4940
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing