Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1001246 DEA: 041Q7214 EFIS: 0423000277
QA Service Level: 1
DIST-CO-RTE-PM: 04-CC,CC,SOL-580,680,780-Var
Work Description: INSTALL FIBER OPTIC CABLE SYSTEM, RAMP METERING, AND WIDEN ROADWAY.
Location Description: ALAMEDA, CONTRA COSTA AND SOLANO COUNTIES AT VARIOUS LOCATIONS
Contractor Name: BAY CITIES PAVING & GRADING, INC.
Contractor Address: Unknown
Resident Engineer: Eddie Dike Structure Rep.: John parecadan
DIME Sample ID: 2026-10-08-23
TL Number from the TL Form:
Sample Submitted By Organization: CT D04 - Pleasanton Field Laboratory
Sample Organization Contact: (510) 224-6127
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 10/08/2026
Date that the sample was received by the laboratory/organization performing the testing: 10/09/2026
The quantity of what the sample constitutes: 750 Tons
A brief description of the sample: 3/4"HMA w/25% RAP
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Pleasanton Plant
DIME Test ID: 2026-10-08-23-1
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 10/12/2026
Date Tested: 10/12/2026
Submitted By Organization: CT D04 - Pleasanton Field Laboratory
Organization Address: 5675 B Gibratar Drive,
Organization City: Pleasanton
Organization State: CA
Organization Zipcode: 94588
Organization Email: dennis.yeung@dot.ca.gov
Organization Phone: (510) 224-6127
General Comments for this Test: Sample #1
Test Result Compliance: complies
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of the specimen basket assembly
|
2916 g
|
|
Mass of the specimen and specimen basket assembly prior to ignition
|
4948 g
|
|
Corrected Asphalt Binder Content
|
4.96 %
|
|
Mass of HMA Sample prior to ignition
|
2032 g
|
|
Mass Loss
|
127.9 g
|
|
Mass of aggregate remaining after ignition
|
1904.1 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
1.18 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
0.15 %
|
|
Test Temperature
|
482 C
|
DIME Test ID: 2026-10-08-23-2
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 10/13/2026
Date Tested: 10/13/2026
Submitted By Organization: CT D04 - Pleasanton Field Laboratory
Organization Address: 5675 B Gibratar Drive,
Organization City: Pleasanton
Organization State: CA
Organization Zipcode: 94588
Organization Email: dennis.yeung@dot.ca.gov
Organization Phone: (510) 224-6127
General Comments for this Test: Sample #1
Test Result Compliance: complies
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
Yes
|
|
Aggregate correction factor for the 2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 1/2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 3/4 in. sieve (% passing)
|
1 %
|
|
Aggregate correction factor for the 1/2 in. sieve (% passing)
|
-0.2 %
|
|
Aggregate correction factor for the 3/8 in. sieve (% passing)
|
0.4 %
|
|
Aggregate correction factor for the #4 sieve (% passing)
|
0.6 %
|
|
Aggregate correction factor for the #8 sieve (% passing)
|
0.6 %
|
|
Aggregate correction factor for the #16 sieve (% passing)
|
-0.5 %
|
|
Aggregate correction factor for the #30 sieve (% passing)
|
-0.8 %
|
|
Aggregate correction factor for the #50 sieve (% passing)
|
-0.6 %
|
|
Aggregate correction factor for the #100 sieve (% passing)
|
-0.1 %
|
|
Aggregate correction factor for the #200 sieve (% passing)
|
0.4 %
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
97 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
87 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
79 %
|
|
Cumulative percent passing the #4 sieve
|
54 %
|
|
Cumulative percent passing the #8 sieve
|
32 %
|
|
Cumulative percent passing the #16 sieve
|
20 %
|
|
Cumulative percent passing the #30 sieve
|
15 %
|
|
Cumulative percent passing the #50 sieve
|
11 %
|
|
Cumulative percent passing the #100 sieve
|
7 %
|
|
Cumulative percent passing the #200 sieve
|
4.4 %
|