Project ID: 1002406 DEA: 09428804 EFIS: 0925000089
QA Service Level: 1
DIST-CO-RTE-PM: 09-INY-395-
Work Description: RTE 395 LITTLE LAKE PAVEMENT PRESERVATION (PM R8.4/R11.8): HMA (TYPE A) OVERLAY & DIGOUTS, HMA DIKE (TYPE E), SHOULDER BACKING, RUMBLE STRIP, FOG SEAL, COLD PLANE, THERMO STRIPING
Location Description:
Contractor Name: Bowman Asphalt Inc.
Contractor Address: 3351 Fairhaven Dr., Bakersfield, CA 93308
Resident Engineer: Hin Hartanto Structure Rep.: Unknown
DIME Sample ID: 2026-10-08-14
TL Number from the TL Form:
Sample Submitted By Organization: CT D09 - Bishop Field Laboratory
Sample Organization Contact: (760) 872-5211
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 10/08/2026
Date that the sample was received by the laboratory/organization performing the testing: 10/07/2026
The quantity of what the sample constitutes: 750 Tons
A brief description of the sample: 3/8" HMA-A-SP PG64-28M
From where was the sample collected: Job Site
Laboratory sample identification: HMA-2
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Bowman Asphalt, Ridgecrest
DIME Test ID: 2026-10-08-14-1
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 10/13/2026
Date Tested: 10/12/2026
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-02
Test Result Compliance: does not comply
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of the specimen basket assembly
|
4257.1 g
|
|
Mass of the specimen and specimen basket assembly prior to ignition
|
5886.2 g
|
|
Corrected Asphalt Binder Content
|
4.88 %
|
|
Mass of HMA Sample prior to ignition
|
1629.1 g
|
|
Mass Loss
|
84.5 g
|
|
Mass of aggregate remaining after ignition
|
1544.6 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
0.31 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
no data0 %
|
|
Test Temperature
|
538 C
|
DIME Test ID: 2026-10-08-14-2
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 10/13/2026
Date Tested: 10/13/2026
Submitted By Organization: CT D09 - Bishop Field Laboratory
Organization Address: 500 South Main Street,
Organization City: Bishop
Organization State: CA
Organization Zipcode: 93514
Organization Email: chris.talbot@dot.ca.gov
Organization Phone: (760) 872-0794
General Comments for this Test: HMA-02 PP Gradation
Test Result Compliance: complies
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
Yes
|
|
Aggregate correction factor for the 2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 1/2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 3/4 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1/2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 3/8 in. sieve (% passing)
|
-2.3 %
|
|
Aggregate correction factor for the #4 sieve (% passing)
|
-2.8 %
|
|
Aggregate correction factor for the #8 sieve (% passing)
|
-4.3 %
|
|
Aggregate correction factor for the #16 sieve (% passing)
|
-5 %
|
|
Aggregate correction factor for the #30 sieve (% passing)
|
-4.8 %
|
|
Aggregate correction factor for the #50 sieve (% passing)
|
-3.7 %
|
|
Aggregate correction factor for the #100 sieve (% passing)
|
-2.5 %
|
|
Aggregate correction factor for the #200 sieve (% passing)
|
-1.6 %
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
96 %
|
|
Cumulative percent passing the #4 sieve
|
54 %
|
|
Cumulative percent passing the #8 sieve
|
31 %
|
|
Cumulative percent passing the #16 sieve
|
20 %
|
|
Cumulative percent passing the #30 sieve
|
14 %
|
|
Cumulative percent passing the #50 sieve
|
9 %
|
|
Cumulative percent passing the #100 sieve
|
6 %
|
|
Cumulative percent passing the #200 sieve
|
4.1 %
|