|
Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 040P1504 Cty SM Rte 92 PM .9, 0.90 Vendor # |
|
REPORT OF LABORATORY TESTING |
||||
|
Resident Engineer: |
Marcus Washington |
Date Reported: |
05/29/2018 |
|
|
Address: |
TL Number: |
05627 |
||
|
City: |
||||
|
Project Name: Construct soldier pile wall |
||||
|
Prime Contractor: RGW Construction Company |
||||
|
Sample Taken Date: |
04/30/2018 |
Mix Design: |
HMB6200 |
|
|
Contractor: Unknown |
Location : In San Mateo County in Half Moon Bay, at 0.91 mile east of Route 1 |
|||
|
Structure unique identifier: Unknown |
||||
|
Structure name: Unknown |
||||
|
Location of Pour: Unknown |
||||
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
| Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
|---|---|---|---|---|---|
| 1 | 6.00 | 28.27 | 120366 | 4257.7 | 1 |
| 2 | 6.00 | 28.27 | 116656 | 4126.5 | 2 |
DIME Test ID: 2018-04-30-2-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4190
Age of specimen: 29 days
Certified By: Mike Mullins
|
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing