Sample Record for 2026-08-13-80
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 1001371 DEA: 024F90U4 EFIS: 0224000157
QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-96-41.0/41.8
Work Description: HMA PAVEMENT, ELECTRICAL, LANDSCAPING AND DRAINAGE.
Location Description: SISKIYOU COUNTY AT AND NEAR HAPPY CAMP FROM INDIAN CREEK BRIDGE TO 0.2 MILE EAST OF DAVIS ROAD
Contractor Name: S.T. Rhoades Construction
Contractor Address: 8780 Old Oregon Trail, Redding, CA 96001
Resident Engineer: Nicholas Riddle Structure Rep.: Unknown
Sample Information
DIME Sample ID: 2026-08-13-80
TL Number from the TL Form: 845655
Sample Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Sample Organization Contact: (530) 225-3194
Type of Sample: Production Start-Up
Type of Material: Aggregate
Sample Taken Date: 08/13/2026
Date that the sample was received by the laboratory/organization performing the testing: 08/13/2026
The quantity of what the sample constitutes: Production Start Up Evaluation
A brief description of the sample: 3 bags of Combined Lime Treated 1/2-inch Aggregate
From where was the sample collected: Manufacturer
Laboratory sample identification: D80338
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: J F Shea Construction - Fawndale Rock and Asphalt - Redding CA
Material Information
Source Identification (SMARA, name of Pit or Job Site): 91-45-0017
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 1/2 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:
Test Results
Test
DIME Test ID: 2026-08-13-80-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 09/09/2026
Date Tested: 08/25/2026
Submitted By Organization: CT D02 - Redding Northern Regional Laboratory
Organization Address: 1657 Riverside Drive,
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: 530-225-3194
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
|
What type of gradation is being tested?
|
HMA Gradation
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
92 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
76 %
|
|
Cumulative percent passing the #4 sieve
|
47 %
|
|
Cumulative percent passing the #8 sieve
|
25 %
|
|
Cumulative percent passing the #16 sieve
|
14 %
|
|
Cumulative percent passing the #30 sieve
|
9 %
|
|
Cumulative percent passing the #50 sieve
|
6 %
|
|
Cumulative percent passing the #100 sieve
|
5 %
|
|
Cumulative percent passing the #200 sieve
|
3.7 %
|