Print Report | Back to Sample Detail

Sample Record for 2026-09-01-27

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1001308 DEA: 081L1804 EFIS: 0819000162 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-91-13.5/16.8
Work Description: JPCP (RSC), INDIVIDUAL SLAB REPLACEMENT (RSC) & RUBBERIZED HMA.
Location Description: RIVERSIDE COUNTY IN RIVERSIDE FROM 0.6 MILE WEST OF VAN BUREN BOULEVARD OVERCROSSING TO 0.2 MILE EAST OF MADISON STREET UNDERCROSSING.
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: Unknown
Resident Engineer: Michael St Jacques Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2026-09-01-27
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 09/01/2026
Date that the sample was received by the laboratory/organization performing the testing: 09/02/2026
The quantity of what the sample constitutes: 1can
A brief description of the sample: Asphalt Binder Sample
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Vulcan Corona

Material Information

Performance Grade: PG 64-16
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier: n/a
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
HMA Type: n/a
HMA Supplier Mix ID Number: n/a

Test Results

Test

DIME Test ID: 2026-09-01-27-1
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/03/2026
Date Tested: 09/03/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 89.2 degree
Dynamic Shear, G*/sin(δ) 1.28 kPa

Test

DIME Test ID: 2026-09-01-27-2
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/03/2026
Date Tested: 09/03/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 88.4 degree
Dynamic Shear, G*/sin(δ) 2.28 kPa

Test

DIME Test ID: 2026-09-01-27-3
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Verified Date: 09/25/2026
Date Tested: 09/21/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is a normal test obtainable? Yes
Number of replicates tested One
Ductility of test #1 (D1) 150 cm
Ductility of sample 150 cm

Test

DIME Test ID: 2026-09-01-27-4
Test Method: AASHTO T313-2025: Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 09/25/2026
Date Tested: 09/24/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Maximum test bath temperature at 240 S 0.0 C
Minimum test bath temperature at 240 S 0.0 C
Estimated Stiffness Modulus 8.0 s 0.000 MPa
Estimated m-value 8.0 s 0.000
Estimated Stiffness Modulus 15.0 s 0.000 MPa
Estimated m-value 15.0 s 0.000
Estimated Stiffness Modulus 30.0 s 0.000 MPa
Estimated m-value 30.0 s 0.000
Estimated Stiffness Modulus 60.0 s 161.914 MPa
Estimated m-value 60.0 s 0.391
Estimated Stiffness Modulus 120.0 s 0.000 MPa
Estimated m-value 120.0 s 0.000
Estimated Stiffness Modulus 240.0 s 0.000 MPa
Estimated m-value 240.0 s 0.000

Test

DIME Test ID: 2026-09-01-27-5
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/25/2026
Date Tested: 09/24/2026
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (213) 792-4797
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 59.4 degree
(G*) x sin(δ)= 4583 kPa