Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1002260 DEA: 081N8104 EFIS: 0823000050
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-40-R135.9/R143.8
Work Description: RHMA-open graded (OGFC), cold plane AC Pvmt, & replace AC Surf.
Location Description:
Contractor Name: SULLY - MILLER CONTRACTING COMPANY
Contractor Address: 135 S STATE COLLEGE BLVD. 400, BREA, CA 92821
Resident Engineer: Anthony Doan Structure Rep.: Unknown
DIME Sample ID: 2026-08-11-86
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Sample Organization Contact: (760) 252-9216
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/11/2026
Date that the sample was received by the laboratory/organization performing the testing: 08/12/2026
The quantity of what the sample constitutes: RHMA-G
A brief description of the sample: 1/2" RHMA-G 1.0% LSM
From where was the sample collected: Manufacturer
Laboratory sample identification: 0521G-26
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Blue Diamond-Victorville
DIME Test ID: 2026-08-11-86-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 08/25/2026
Date Tested: 08/18/2026
Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: kaushalkumar.talati@dot.ca.gov
Organization Phone: (951) 840-8328
General Comments for this Test: Sieves: 3/8", #4 & #200 - Out of Range
Test Result Compliance:
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
Yes
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
96 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
78 %
|
|
Cumulative percent passing the #4 sieve
|
28 %
|
|
Cumulative percent passing the #8 sieve
|
20 %
|
|
Cumulative percent passing the #16 sieve
|
15 %
|
|
Cumulative percent passing the #30 sieve
|
11 %
|
|
Cumulative percent passing the #50 sieve
|
6 %
|
|
Cumulative percent passing the #100 sieve
|
2 %
|
|
Cumulative percent passing the #200 sieve
|
1.1 %
|