Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 1001573 DEA: 060X2904 EFIS: 0618000050
QA Service Level: 1
DIST-CO-RTE-PM: 06-FRE-33-13.9/16.7
Work Description: HMA (TYPE A), RDWY EXC, CL 2 AB, CURB RAMPS AND MOBILIZATION.
Location Description: FRESNO COUNTY IN AND NEAR COALINGA FROM ENTERPRISE PARKWAY TO LOS GATOS CREEK SOUTH CHANNEL BRIDGE
Contractor Name: Cal Valley Construction, Inc. (Chris Grimm)
Contractor Address: Unknown
Resident Engineer: Din Dadawalla Structure Rep.: Unknown
DIME Sample ID: 2026-07-16-10
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Millbrook Field Laboratory
Sample Organization Contact: (559) 341-3953
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 07/16/2026
Date that the sample was received by the laboratory/organization performing the testing: 07/16/2026
The quantity of what the sample constitutes: 1691 TONS
A brief description of the sample: 3/4 HOT MIX ASPHALT
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Coalinga
DIME Test ID: 2026-07-16-10-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 07/20/2026
Date Tested: 07/17/2026
Submitted By Organization: CT D06 - Millbrook Field Laboratory
Organization Address: 1352 W. Olive Ave,
Organization City: Fresno
Organization State: CA
Organization Zipcode: 93728
Organization Email: tomas.silva@dot.ca.gov
Organization Phone: (559) 341-3953
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
What temperature unit is used?
|
Celsius
|
|
Test procedure used?
|
Method A
|
|
Mass of the specimen basket assembly
|
2924.9 g
|
|
Mass of the specimen and specimen basket assembly prior to ignition
|
5091.5 g
|
|
Mass of HMA Sample prior to ignition
|
2166.6 g
|
|
Corrected Asphalt Binder Content
|
4.98 %
|
|
Mass Loss
|
138 g
|
|
Mass of aggregate remaining after ignition
|
2028.6 g
|
|
Correction Factor (Percent by mass of HMA Specimen)
|
1.25 %
|
|
Moisture Content
|
no data0 %
|
|
Temperature Compensation Factor
|
0.14 %
|
|
Test Temperature
|
482 C
|
DIME Test ID: 2026-07-16-10-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 07/20/2026
Date Tested: 07/17/2026
Submitted By Organization: CT D06 - Millbrook Field Laboratory
Organization Address: 1352 W. Olive Ave,
Organization City: Fresno
Organization State: CA
Organization Zipcode: 93728
Organization Email: tomas.silva@dot.ca.gov
Organization Phone: (559) 341-3953
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
|
Is an aggregate correction factor used?
|
Yes
|
|
Aggregate correction factor for the 2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 1/2 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 1 in. sieve (% passing)
|
no data0 %
|
|
Aggregate correction factor for the 3/4 in. sieve (% passing)
|
-0.6 %
|
|
Aggregate correction factor for the 1/2 in. sieve (% passing)
|
0.6 %
|
|
Aggregate correction factor for the 3/8 in. sieve (% passing)
|
-0.4 %
|
|
Aggregate correction factor for the #4 sieve (% passing)
|
-2.6 %
|
|
Aggregate correction factor for the #8 sieve (% passing)
|
-3 %
|
|
Aggregate correction factor for the #16 sieve (% passing)
|
-2.8 %
|
|
Aggregate correction factor for the #30 sieve (% passing)
|
-1.8 %
|
|
Aggregate correction factor for the #50 sieve (% passing)
|
-1.8 %
|
|
Aggregate correction factor for the #100 sieve (% passing)
|
1.6 %
|
|
Aggregate correction factor for the #200 sieve (% passing)
|
-1.1 %
|
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
|
Cumulative percent passing the 3/4 in. sieve
|
96 %
|
|
Cumulative percent passing the 1/2 in. sieve
|
88 %
|
|
Cumulative percent passing the 3/8 in. sieve
|
78 %
|
|
Cumulative percent passing the #4 sieve
|
56 %
|
|
Cumulative percent passing the #8 sieve
|
38 %
|
|
Cumulative percent passing the #16 sieve
|
26 %
|
|
Cumulative percent passing the #30 sieve
|
19 %
|
|
Cumulative percent passing the #50 sieve
|
13 %
|
|
Cumulative percent passing the #100 sieve
|
10 %
|
|
Cumulative percent passing the #200 sieve
|
3.5 %
|