Sample Record for 2026-06-25-24
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 1001573 DEA: 060X2904 EFIS: 0618000050
QA Service Level: 1
DIST-CO-RTE-PM: 06-FRE-33-13.9/16.7
Work Description: HMA (TYPE A), RDWY EXC, CL 2 AB, CURB RAMPS AND MOBILIZATION.
Location Description: FRESNO COUNTY IN AND NEAR COALINGA FROM ENTERPRISE PARKWAY TO LOS GATOS CREEK SOUTH CHANNEL BRIDGE
Contractor Name: Cal Valley Construction, Inc. (Chris Grimm)
Contractor Address: Unknown
Resident Engineer: Din Dadawalla Structure Rep.: Unknown
Sample Information
DIME Sample ID: 2026-06-25-24
TL Number from the TL Form:
Sample Submitted By Organization: CT D06 - Millbrook Field Laboratory
Sample Organization Contact: (559) 341-3953
Type of Sample: Acceptance
Type of Material: Aggregate
Sample Taken Date: 06/25/2026
Date that the sample was received by the laboratory/organization performing the testing: 06/25/2026
The quantity of what the sample constitutes: 300 tons
A brief description of the sample: 3/4 Coldfeed
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite Construction Company
Material Information
Source Identification (SMARA, name of Pit or Job Site): 91-10-0005
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: CF Divertor @ Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number: 1
Sublot number: 19
Aggregate Mix Number:
Test Results