Print Report | Back to Sample Detail

Sample Record for 2026-06-10-30

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 1002310 DEA: 010P6404 EFIS: 0125000053 QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-101-R131.7/134.6
Work Description: Boyes Creek Viaduct
Location Description:
Contractor Name: GR Sundberg Inc
Contractor Address: 5211 Boyd Road, Arcata CA, 95521
Resident Engineer: Ryan Dunne Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2026-06-10-30
TL Number from the TL Form:
Sample Submitted By Organization: CT D01 - Crescent City Field Laboratory
Sample Organization Contact: (707) 496-5581
Type of Sample: Quality Assurance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 06/10/2026
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 4 bags
A brief description of the sample: 1/2 RHMA PG 64-16
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Mercer Fraser Boyd Road

Material Information

HMA Type: RHMA-G
HMA Grading: 1/2 inch
Lot number:
Sublot number:
HMA Mix Number:
Binder content (%): 0.0
Virgin binder PG:
Design binder PG:
Binder Supplier:
RAP content (%):
WMA Additives:
Antistrip type:

Test Results